This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| news:server_migrations_il [2024/11/26 12:55] – jansen | news:server_migrations_il [2024/12/02 10:46] (current) – jansen | ||
|---|---|---|---|
| Line 40: | Line 40: | ||
| - | ===== Friday 29-11-2024 9 AM: License server ===== | + | ===== Friday 29-11-2024 9 AM: License server |
| - | During this change, connections for reserved licenses will be disrupted (eg IDL, Mathematica). In many cases, the software will recover once the license server is back online in the new location, but that is not something we can guarantee. So make sure you close your session or save your data. | + | <color #c8bfe7>During this change, connections for reserved licenses will be disrupted (eg IDL, Mathematica). In many cases, the software will recover once the license server is back online in the new location, but that is not something we can guarantee. So make sure you close your session or save your data. |
| - | + | </ | |
| - | ===== Monday 02-12-2024: 10 AM: Mail ===== | + | |
| + | ===== Monday 02-12-2024: 10 AM: Mail Done ===== | ||
| + | <color #c8bfe7> | ||
| A new IL mail server has been prepared. During this switch, e-mail will temporarily not be available, estimated time ~ 50 minutes. | A new IL mail server has been prepared. During this switch, e-mail will temporarily not be available, estimated time ~ 50 minutes. | ||
| - | Incoming mail will be delayed but will arrive once the new server is operational. | + | Incoming mail will be delayed but will arrive once the new server is operational.</ |
| --- | --- | ||